RE Projects Development Ltd has recently submitted a Section 36 application for the South Kintore BESS to the Scottish Government’s Energy Consents Unit (ECU). The application is expected to be published on 27 June 2025, from which point members of the public will be able to formally review and comment on the proposals.

How to make comments and representations on the application:

Any representations to the application may be by email to the Scottish Government, Energy Consents Unit mailbox at representations@gov.scot; or by post to the Scottish Government, Energy Consents Unit, 4th Floor, 5 Atlantic Quay, 150 Broomielaw, Glasgow, G2 8LU, identifying the proposal and specifying the grounds for representation.

Written or emailed representations should be dated, clearly stating the name (in block capitals), full return email and postal address of those making representations. Only representations sent by email to representations@gov.scot will receive acknowledgement.

All representations should be received not later than 03 August 2025, although Ministers may consider representations received after this date.

As a result of a statutory objection from the relevant planning authority, or where Scottish Ministers decide to exercise their discretion to do so, Scottish Ministers can also cause a Public Local Inquiry (PLI) to be held.

Following examination of the environmental information, Scottish Ministers will determine the application for consent in one of two ways:

•      Consent the proposal, with or without conditions attached; or

•      Reject the proposal

The Application Documents

Plans and Elevations:

Indicative Site Layout Plan
Site Location Plan
Plan and Elevations of Substation Building
Plan and Elevations of 132kV Switchyard
Plan and Elevations of Transmission Operator Building
Plan and Elevations of Water Tank
Plan and Elevations of LV Cabinet and Standby Generator
Plan and Elevations of BESS Unit and Transformer Station
Plan and Elevations of CCTV and Lighting Column
Plan and Elevations of Storage Container and Auxiliary Transformer

Documents and Reports:

Application Cover Letter
Construction Traffic Management Plan
Design and Access Statement
EIA Screening Opinion
Ecological Impact Assessment
Flood Risk Assessment and Surface Water Drainage Strategy
Historic Environment Desk Based Assessment
Noise Impact Assessment
Outline Battery Safety Management Plan
Planning Statement
Pre-Application Consultation Statement
Transportation Statement
Tree Survey
Protected Species Survey
Landscape and Visual Appraisal

Landscape and Visual Appraisal Appendices and Figures:

Figure 1: Site Location Plan
Figure 2: SZTV
Figure 3: Landscape Design and Visual Receptors Plan
Figure 4: Landscape Character Plan
Figure 5: Topography
Figure 6: Cumulative Sites
Appendix 1: Assessment Criteria
Appendix 2: Detailed Planting Plan
Appendix 3: Type 1 Photoviews
Appendix 4: Photomontages